Photo Performance Project

Copper Smelter

Relocation Machine Press 800 & 400 Ton PT. IPPI

Repair & Reinstall Machine Press 800 T PT. IPPI

Install Machine Press 4000 T at PT. GKD

Installation Drum Breaker Inside Building With Rail and Jack

Piping and Ducting at Copper Smelter

Installation Reactor at PT. Branta Mulia Tyre Yarn

Installation Kiln Sheel Site Fabrication

Piping Work at IKPT Project

Alignment Main Gas Blower & Gear Box to Blade at PT. Copper Smelting Gresik

Automation Slot Cleaning Machine at Indonesia Asahan Aluminium

 

Installation of Evaporator at Pertamina Project

 

Copyright © PT. HIDRO MASINDO SENTRATEK