PAST PERFORMANCE PT. HIDRO MASINDO SENTRATEK

YEAR-90
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Over haul Die Sport Press
PT. DAIHATHSU INDONESIA
May-90
o
o
2
Making Control System
PT. Yudistira Utama Indonesia
July-90
o
3
Over Haul Accu Plant MC
PT. Gemala Batteray
Sep-90
o
o
4
Install Inspection Line
PT. Indo Suzuki Int
Dec-90
o
o
5
Fabricate Steel Structure
PT. Indo Suzuki Int
Dec-90
o
o
6
Over Haul H Press
PT. Intan Pertiwi
Dec-90
o
o

 

YEAR-91
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Setting Blower 90 KW
PT. Indo Suzuki Int
Jan-91
o
2
Making Control System
PT Argo Pantes
Feb-91
o
3
Over Haul 2000T Press
PT. Yudistira Utama Indonesia
Apr-91
o
   
4
Making Control System
PT. Yudistira Utama Indonesia
Apr-91
o
5
Making Control System
PT. Teluk Gong Utama
May-91
o
6
Install Shearing Line
PT. Steel Center Ind
Jul-91
o
o
7
Install Shearing Line
PT. Steel Center Ind
Jul-91
o
o
8
Install Trans Crane
PT. BPP Tanjung Priuk
Sep-91
o
o
9
Repaire M/C Press 800 T
PT. Materindo S.M
Sep-91
o
10
Install 200 Press
PT. Nippon Denso Indo
Sep-91
o
11
Install Dryer Line
PT. Centex
Dec-91
o
o

 

YEAR-92
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Install Forging Press
PT. Nippon Denso Indonesia
Jan-92
o
o
2
Install OHC
PT. Steel Center Indonesia
Feb-92
o
o
3
Over Haul 150 T Press
PT. Teluk Gong Utama
Feb-92
o
   
4
Over Haul 200 T Press
PT. Bejana Kencana
Feb-92
o
5
Relocate CNC MC
PT. Inti Ganda Perdana
Mar-92
o
o
o
6
Install Hdy Press 400 T
PT. Gemala Kempa Daya
May-92
o
o
7
Install Trans Crane
PT. BPP Tanjung Priuk
May-92
o
8
Install OHC
PT. Steel Center Indo
May-92
o
o
9
Install Press Line
PT. Indo Suzuki Int
Jul-92
o
o
o
10
Relocate Overhaull 400 T Press
PT. IPPI
Aug-92
o
o
o
11
Relocate Overhaull 800 T Press
PT. IPPI
Aug-92
o
o
o
 
12
Repiping Press
PT. IPPI
Aug-92
o
o
13
Over Haul Copy Milling
PT. IPPI
Aug-92
o
o
o
14
Install Forging Line
PT. United Tractor
Sep-92
o
o
o
o
15
Install Trape Shearing Line
PT. Steel Center Indonesia
Oct-92
o
o
16
Relocate Under Carriage Pnat
PT. Inti Ganda Perdana
Nov-92
o
o
o
17
Relocate Under Carriage Pnat
PT. Wahana Eka Paramitra
Dec-92
o
o
o
18
Install Insulator Plant
PT.WIKA NGK-JV
Dec-92
o
o
o
o

 

YEAR-93
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Relocate Press Shop
PT. Ind Suzuki Int
Jan-93
o
o
o
2
Install 1200 T Press
PT. Gema Motor Mfg
Apr-93
o
o
3
Install 1500 T Press
PT. Toyota Motor Astra
Apr-93
o
 
o
4
Making Control Panel
PT. IPPI
Jun-93
o
5
Modification of 100 Press
Private Work Shop
Jul-93
o
6
Install Plastik Moulding
PT. WIKA, DMP
Aug-93
o
o
7
Making Dust Collector System
PT. Chemco Harapa Ind
Sep-93
o
o
o
8
Relocate Press Line
PT. Imora Honda
Nov-93
o
o
o
o
9
Install Rolling M/C
PT. WIKA DKI
Nov-93
o
10
Relocate D/G 1000 KVA
PT. Yakult
Nov-93
o
o
o
o
11
Make Autohoist Structure
PT. GMBI/Taikisha
Nov-93
o
o
o

 

YEAR-94
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Install Deying and Weaving Line
PT. ISTM
Feb-94
o
o
2
Install New Piping Line
PT. ISTM
Feb-94
o
o
o
3
Fabricate Machine Frame
PT. ISTM
Feb-94
o
o
4
Repaire Press 1500/600/300
PT. AMMI
Feb-94
o
 
5
Install Press 800 T/ 600 T
PT. Toyota Astra Motor
Apr-94
o
o
6
Relocate Brake Shoa Plant
PT. Tri Dharma Wisesa
May-94
o
o
7
Make G Crane for Container
PT. Wahana Eka Paramitra
May-94
o
o
o
o
8
Install Pipe Tube Factory
PT. Indo Mitra Sedaya
Jul-94
o
o

 

YEAR-95
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Install Tube Mill Factory KT- 24
PT. Bakrie Pipe Indonesia
Jan-95
o
o
2
Install Silting Line
PT. Indo Mitra Sedaya
Feb-95
o
o
3
Install Crane
PT. Essar Dhananjaya
Apr-95
o
o
 
o
4
Install Production Machine
PT. Yoshicu
Apr-95
o
o
5
Install Boiller
PT. YKK
Apr-95
o
6
Install Finishing Line
PT. Bakrie Pipe Indonesia
Jun-95
o
7
Repair Press
PT. Metbelosa
Jun-95
o
8
Relocate Factory
PT. Inti Ganda Perdana
Aug-95
o
o
o
9
Fabricated Ducting Line
PT. Inti Ganda Perdana
Aug-95
o
o
o
10
Repair Boring Machine
PT. UTE
Sep-95
o
11
Fabricated OHC
PT. TDW
Sep-95
o
o
o
12
Fabricate Tank and Hopper
PT. Yoshicu
Sep-95
o
o
13
Fabricate Gantri Crane
PT. Yoshicu
Sep-95
o
o
o
14
Repair Press
PT. AMMI
Nov-95
o
15
Fabrication of 20000 I Diesel Oil
PT. Coca Cola Bolting Co
Nov-95
o
o
16
Install Dyeing Line
PT. Toyobo KI
Dec-95
o
o
o
o

 

YEAR-96
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Install Container Crane
UPTK 1
Jan-96
o
2
Relayout Factory
PT. Inti Ganda Perdana
Feb-96
o
o
3
Relocate Factory
PT.WEP
Jun-96
o
o
o
4
Relocate Die Shop Machine
PT. HUFI
Jun-96
o
o
o
5
Install Forigin Factory
PT. HUFI
Jul-96
o
o
o
o
6
Fabricate Pedestal
PT. Amco
Jul-96
o
o
7
Install Machining Shop
PT. HUFI
Aug-96
o
o
8
Relocation of Assy Line
PT. General Buana Motor Ind
Sep-96
o
o
o
o
9
Install HVAC System
PT. Matsushita S.I
Sep-96
o
10
Wiring Work for Assy Inspection booth, Office
o
o
11
Install CRM Machinaries
PT. Essar Dhananjaya
Sep-96
o
o
o
12
Install Tire Yan Factory
PT. Branta Mulia Teijin Ind
Sep-96
o
o
o
13
Site Fabricatin Of Silo 200 M3
PT. Branta Mulia Teijin Ind
Sep-96
o
o
o

 

YEAR-97
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Install Process Machine
PT. Logam Sari Bearindo
May-97
o
o
o
o
2
Install Panel Factory
PT. Hebel Indonesia
May-97
o
3
Install Equipment, Structure, Piping
PT.Smelting Co
May-97
o
o
o
4
Install Electrical /Instrument for Power Plant
PT. Indo Codeco Cement
May-97
o
o
o
5
Install Workshop Machine
PT. United Tractor
Jun-97
o
6
Making Inspection Booth
PT. General Motor Buana Ind
Aug-97
o
o
o
7
Fabricate Assy Line Structure
Peter Mc Lelan & Associates
Aug-97
o
o

 

YEAR-98
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Install Ship, Dryer
PT. Gulf Indonesia
Mar-98
o
2
Add Work of Copper Smalter Plant
PT. Smelting Co
Apr-98
o
o
3
Relocation of Assy Plant
PT. General Motor Buana Indonesia
Sep-98
o
o
o
o
4
Installation of Drain System Plant
PT. SKF Indonesia
Oct-98
o
o
o
5
Relocation of Welding Plant
PT. General Motor Buana Indonesia
Dec-98
o
o
o
o

 

YEAR-99
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Relocation of Banding Plant
PT. Asahimas
Jan-99
o
o
o
o
2
Relocation of NCL-1 Plant
PT. Asahimas
Feb-99
o
o
o
o
3
Installation of Slitting Line
PT. Bakri Pipe Indonesia
Feb-99
o
o
o
4
Pipeline Pickling Work
PT. Supra Aluminium
Mar-99
o
o
o
5
Install Container Crane
Pelindo V
Nov-99
o
o
o
6
Making Access Road
PT. Humpuss Patragas
Nov-99
o
o
o

 

YEAR-00
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Relocation Machines
PT. Pandu Daya Tama Patria
Jan-00
o
o
o
o
2
Install Heming Press
PT. Toyota Astra Motor
Mar-00
o
3
Relocation and Install Machine
PT. SKF Indonesia
Apr-00
o
o
4
Install Heming Press
PT. Shinwa Engineering
Jun-00
o
5
Repaire Press Machine
PT. Ihara Teknis Indonesia
Jul-00
o
6
Install Machine
PT. SKF Indonesia
Jul-00
o
7
Install Machine Heming L - Door
PT. Shinwa Engineering
Jul-00
o
8
Relayout Machines
PT. Inti Ganda Perdana
Aug-00
o
o
9
Relayout Machines
PT. Inti Ganda Perdana
Aug-00
o
10
Install Machines
PT. Satria Teknik Global
Aug-00
o
11
Making Drill Site Foundation
PT. Mobil Oil Cepu
Sep-00
o
12
LNP-Piping Fabrication
PT. Teco Electro Indonesia
Oct-00
o
o
13
Relocation Machines
PT. SKF Indonesia
Dec-00
o
o

 

YEAR-01
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Layout Assembly Chanel 2
PT. SKF Indonesia
Feb-01
o
o
2
Installation Rabit Machine CH4
PT. SKF Indonesia
Feb-01
o
3
Relocation Washing Machine CH2
PT. SKF Indonesia
Apr-01
o
 
4
Installation Rabit Machine CH2
PT. SKF Indonesia
May-01
o
5
Relocation Ultra Sonic Washing Machine CH4
PT. SKF Indonesia
May-01
o
6
Relocation Printing Line Machine & AC Equipment
PT. Satria Tehnik Global
May-01
o
o
7
Relocation Paint Booth RA 2/3
PT. Inti Ganda Perdana
May-01
o
8
Wiring and Installation Receptacles
PT. Satria Tehnik Global
May-01
o
9
Installation Bore Rabbit CH1
PT. SKF Indonesia
Jul-01
o
10
Repairing Painting Booth RA1
PT. Inti Ganda Perdana
Jul-01
o
o
11
Service & Installation Exhaust Fan
PT. Inti Ganda Perdana
Aug-01
o
12
Repair Body Machine Hardening VFL 1000
PT. Inti Ganda Perdana
Jul-01
o
o
13
Changing Axial Fan Fulle Y20 Phase 380
PT. Inti Ganda Perdana
Aug-01
o
14
Installation of Heater Machine
PT. Satria Tehnik Global
Oct-01
o
o
15
Repair Painting Booth RA1
PT. Inti Ganda Perdana
Oct-01
o
o
o
16
Machine Relocation, Installation Mechanical & Electrical In can making & Filling Packing
PT. Nestle Indonesia
Dec-01
o
o
o
o
o

 

YEAR-02
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Fabricaate Exhaust Wall Fan
PT. Nestle Indonesia
Jan-02
o
2
Fabricate Exhaust Ducting For Storage Tank Room
PT. Nestle Indonesia
Jan-02
o
o
o
3
Dismantling, Packing, Transfer, Repair,Install loading Dock
PT. SKF Indonesia
Jan-02
o
 
4
Installation MC Broancing & Milling
PT. Inti Ganda Perdana
Feb-02
o
5
Repair shawing Machine
PT. Tira Andalan Steel
Feb-02
o
6
Fabrication, Repair, Dismantling and Transfering
PT. Nestle Indonesia
May-02
o
7
Fabricate & Install Lift
PT. Nestle Indonesia
May-02
o
o
8
Dismantling can making and Filling Packing
PT. Nestle Indonesia
Jun-02
o
o
9
Electric, Installation in Dock Leveller
PT. Nestle Indonesia
Jun-02
o
o
10
Mechanical & Electrical Installation of Pal Elematic 3000
PT. Nestle Indonesia
Jul-02
o
o
11
Mechanical & Electrical Inst of Fizzi Premix Equipment of Vitami Room
PT. Nestle Indonesia
Aug-02
o
o
o
12
Mech & Electrical Installation of filling fizzi Equipment in Engron 2
PT. Nestle Indonesia
Aug-02
o
o
o
13
Fabricate and Installation Support
PT. Nestle Indonesia
Aug-02
o
o
14
Install Repair Can Making & Filling Packing
PT. Nestle Indonesia
Aug-02
o
o
o
15
Dismantling Packaging Rack in The Warehouse Area
PT. Nestle Indonesia
Sep-02
o
16
Dismantling Packaging anda Transfering
PT. Nestle Indonesia
Sep-02
o
17
Installation Printing Machine 4 & 5
PT. Satria Tehnik Global
Sep-02
o
18
Fabrication/Dismantling of Support for Shaking Conveyor
PT. Nestle Indonesia
Sep-02
o
o
 
19
Installation, Equipment for Instan Cereal Big Bang Tipping
PT. Nestle Indonesia
Sep-02
o
o
o
20
Installation Capping Machine in Malbach Line
PT. Nestle Indonesia
Oct-02
o
o
o
21
Transfering Drymix Equipment
PT. Nestle Indonesia
Oct-02
o
o
o
22
Installation Rovema Filling Machine Line Big Bag Tipping
PT. Nestle Indonesia
Oct-02
o
o
o
23
Installation Com & New Dryer & Dismantling Com & Old Dryer
PT. SKF Indonesia
Oct-02
o
o
o
24
Relocate Tote Tili With Shaking Conveyor of Base Powder
PT. Nestle Indonesia
Oct-02
o
o
o
o
25
Installation Capping Machine of Made New Twister
PT. Nestle Indonesia
Oct-02
o
o
o
26
Fabrication and Installation Protection Cover at Filling Room Egron2
PT. Nestle Indonesia
Oct-02
o
o
27
Fabricatin Frame of Shaking Conveyor
PT. Nestle Indonesia
Oct-02
o
o
28
Relocation Machine Printing 3 and AC
PT. Satrial Tehnik Global
Nov-02
o
o
o
29
Modification and Repainting Frame of Shaking Conveyor
PT. Nestle Indonesia
Nov-02
o
o
30
Installation Machine at Chanel 2 & 6
PT. SKF Indonesia
Dec-02
o
o
o
31
Installation Machine Chanel 8 & Air Compressor
PT. SKF Indonesia
Dec-02
o
o
o
32
Installation and Modification Shaking Conveyor
PT. SKF Indonesia
Dec-02
o
o
o
33
Nitrogen Piping Installation of FMC Filling Machine
PT. SKF Indonesia
Dec-02
o
o
o
34
Installa & Fabrication Blower in Canflamer
PT. SKF Indonesia
Dec-02
o
o
o

 

YEAR-03
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Modification Pipe Air Compressor at Shaking Conveyor
PT. Nestle Indonesia
Jan-03
o
o
2
Interlock Conveyor Support
PT. Nestle Indonesia
Feb-03
o
3
Transport and Handling for several
PT. Nestle Indonesia
Mar-03
o
 
5
Repair shawing Machine
PT. Nestle Indonesia
Mar-03
o
6
Transfer Equipment From Waru
PT. Nestle Indonesia
Mar-03
o
o
o
7
Install for Support Sensor (Bronzoli Pallet) & Install Pipe and Rack C02
PT. Nestle Indonesia
Mar-03
o
8
Additinal Job for Machine Chanel 8, Machine Rabbit & Machine R & S
PT. Nestle Indonesia
Mar-03
o
o
9
Dismantling, Transportation, Reinstallation & Recondition Testin and Comissioning
PT. Satria Tehnik Global
Mar-03
o
o
o
10
Dismantling, Transportation, Reinstallation & Recondition
PT. Nestle Indonesia
Apr-03
o
o
o
11
RPLC of Upper and Lower
PT. Indonesia Asahan Aluminium
Apr-03
o
12
Erection Kiln at Cement Cibinong Cilacap Plant
PT. Barata Indonesia
Apr-03
o
13
Installation Centrifugal Fan W/Ducting & Housing Fitter for Paf Room
PT. Nestle Indonesia
Apr-03
o
o
14
Dismantling and Reinstall Base Powder
PT. Nestle Indonesia
Apr-03
o
15
Fabrication new frame of Totetilit Station
PT. Nestle Indonesia
Apr-03
o
o
16
Installation Material Supply Utility pipe for F/P Extention
PT. Nestle Indonesia
Apr-03
o
o
17
Loading Transportation and Unloading
PT. Satria Tehnik Global
May-03
o
o
18
Decommissioning refiner couching machine & Brown Tank 5 Ton
PT. Cadbury Indonesia
May-03
o
 
19
Labour supply at PT Asahimas Flat Glass
PT. Satria Tehnic Globalis
Jul-03
o
20
Additional Work Labour Supply
PT. Satria Tehnic Globalis
Jul-03
o
21
Portable & Raw Water Utilities Piping Completed
WithTheir Pumps
PT. Imeco Inter Sarana
Jul-03
o
o
22
Fire Water system including Diesel engine pump,
electric pumps, jockey pump, fire hydrant, fire
monitor, fire extinguiser, and piping system
PT. Imeco Inter Sarana
Jul-03
o
23
Diesel Fuel Tank cap.10.000 Kl with API 650
standard
PT. Imeco Inter Sarana
Jul-03
o
o
24
Suplly, Install and Comissioning of Pressure Control
Valve, stutdown valve, and Flow Control Valve
actuated with motor and Pneumatic system for
liquid fuel line
PT. Imeco Inter Sarana
Jul-03
o
25
Lifting Erection and Positioning of Spinning
Machineries
PT. Mutu Gading Tekstil
Sep-03
26
Piping Welding, Piping Erection
PT. Mutu Gading Tekstil
Oct-03
o
27
Labour Charges for Fabrication & Installation
Support Machines
PT. Mutu Gading Tekstil
Nov-03
o
28
Supply Consumable
PT. Mutu Gading Tekstil
Nov-03
o
29
M.E Installasi, Relokasi Mesin CH : 1 & 3
PT. SKF Indonesia
Dec-03
o
o
30
Labour Charges for Fabrication & Installation
Support Machines
PT. Mutu Gading Tekstil
Dec-03
o
31
Installation of CNC Drilling Machine Janbac at PT.
Asahimas Flat Glass Tbk
PT. Satria Tehnik Globalis
Dec-03
o
32
Supply Consumable
PT. Mutu Gading Tekstil
Dec-03
o

 

YEAR-04
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Piping Welding & Piping Erection
PT. Mutu Gading Tekstil
Jan-04
o
2
Procurement & Delivery Equipment and Installation
PT. Pembangunan Perumahan ( PP )
Jan-04
o
3
Labaor Charges for Fabrication and Installation
Support Machine
PT. Mutu Gading Tekstil
Jan-04
o
4
Supply Consumable
PT. Mutu Gading Tekstil
Jan-04
o
5
Removing Brounching machine
PT. Inti Ganda Perdana
Jan-04
o
6
Transportation, Dismantling and Installation of Sea
Water Desalinator Unit Pertamina UP IV Cilacap
PT. Sutindo Project Ind
Mar-04
o
7
Urea Handling Work
PT. Swadaya Graha
Apr-04
o
o
8
Repair System Water Intake and Civil Work rehabilitation PLTU Unit #3 and Unit #4
PT. Swadaya Graha
Jun-04
o
o
o
9
Repair Pipe CWP from Outlet Condenser to Outfall Unit #3 & #4 PLTU Tanjung Priuk
PT. PAL Indonesia
Sep-04
o

 

YEAR-05
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Change Pipe Conduit in Area CWP Pump House, Repair and making Net Screen in Area Water Intake Project Rehabilitation PLTU Unit #3 & #4 Tanjung Priuk
PT. PAL Indonesia
Jan-05
o
o
2
Make Ground floor in control room and bak outfall in area water intake project Rehabilitation PLTU Unit #3& #4 Tanjung Priuk
PT. PAL Indonesia
Jan-05
o
o
3
Remove machine RDM and RCM
PT. SKF Indonesia
Jul-05
o
4
Remove Machine Drinsing Present
PT. SKF Indonesia
Jul-05
o
o
o
5
Remove Machine CLG 5 BN, DSG
PT. SKF Indonesia
Jul-05
o

 

YEAR-06
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Overhall & Installation HV -140 + HV - 3 & HV-
1600
PT. SKF Indonesia
Apr-06
o
2
Overhall & Installation HV -140 + HV - 3 & HV- 1600 (Procurement)
PT. SKF Indonesia
Apr-06
o
3
Piping Ujung Pangkah Development Project 1
Amerada HESS
May-06
o
o

 

YEAR-07
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Piping Ujung Pangkah Development Project 2
Amerada HESS
Dec-07
o
o

 

YEAR-08
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Renewal Anode Slot Cleaning Machine
PT. Indonesia Asahan Aluminium
Jun-08
o
o
o
o

 

YEAR-09
No
Project
Owner
Time
Kind of Job
Mech'l
Str
Pipe
Rel
E/L
1
Steel Structure For Main Building, Central Control
Building, Coal Handling System and Auxiliary (PLN Project PLTU at Pacitan)
Hubei Hongyuan Power Engineering Co. Ltd
Jun-08
o
o
o
o

 

Copyright © PT. HIDRO MASINDO SENTRATEK